In order to give a thrust to rooftop and other small solar power plants
connected at distribution network at voltage levels below 33 KV envisaged under
Phase I of the Jawaharlal Nehru National Solar Mission (JNNSM), the Ministry of
New and renewable Energy (MNRE) has launched a programme on generation based
incentives, referred to as 'Rooftop & Small Solar Power Generation Programme'
(RPSSGP).
It is Proposed to develop solar capacity of 100 MW under two categories as,
|
|
|
Category |
Project Category |
Capacity Limit |
|
1 |
Project connected at HT level of distribution network with installed capacity of
100 KW and up to 2 MW |
90 MW |
|
2 |
Project connected at LT level of distribution network with installed capacity
lower than 100 KW |
10 MW |
|
|
The present guidelines are applicable to Catagory-1 projects, with minimum
installed capacity of 100 KW and up to 2MW. |
|
|
|